Corratober, Co.Cavan, H12 XN66
Proposed development
Retain semi-detached domestic garage, alterations to site boundaries & all ancillary works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 29 Aug 2021
- Residential units
- 1
- Floor area
- 27.3 m²
Timeline
Application received
5 Jul 2021
Decision due
29 Aug 2021
Decision: conditional
24 Aug 2021
Grant issued
29 Sept 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of: • An increase in waste acceptance of 99,000 tonnes of waste per annum. • Construction of extension of the existing Waste Processing Building to the east with 2 No. vehicular doors (7.8 m (H) x 5.7 m (W)) and 3 No. pedestrian access doors (2.1 m (H) x 1.2 m (W)). The proposed eastern extension is approximately 1,147.5 m2 in size. • Construction of extension of the existing Waste Processing Building to the north with 1 No. Roller Access Door (3.1 m (H) x 3.0 m (W)), 3 No. pedestrian access doors (2.1 m (H) x 1.2 m (W)) and an open eastern façade ((11.2 m (H) x 40.0 m (W)). The proposed northern extension is approximately 1,500 m2 in size. • Relocation of the air abatement stack to the northern façade of the proposed northern extension, stack height increased to 20.0 m. • Removal of 1 No. existing vehicular access door (c. 7.8 m (H) x 5.65 m (W)) on the southern elevation of existing Waste Processing Building. • Construction of 7 no. external storage bays on the north façade of the Waste Processing Building. • Concrete hardstanding at rear yard with an area of 3,583 m2. • Construction of a retaining wall measuring 21.2 m (L) and between 1.0 - 2.5 m in height at the north-west corner of the proposed extension to the north of the existing Waste Processing Building. • Construction of a retaining wall measuring 93.62 m (L) and between 1.0 - 6.5 m in height at the north-east corner of the rear yard, extending from the north-east corner of the proposed east extension. • Extension of existing services - the extension of storm water network will consist of the provision of gutters and channels at roof level, new down pipes on new building extensions, new carrier drains, filter drains, gulleys, slot drains and manholes in the new concrete hardstanding and new filter drains and rodding eyes to the rear of the proposed retaining walls. An extension of the existing leachate collection system, to collect and convey leachate from the proposed extensions to the existing leachate drainage network and storage tank. Existing services including drainage, water, foul, electric, communications and fire water supply will be locally lowered or moved to avoid the proposed foundations. • Replacement of 7 no. existing overnight lorry parking spaces with 7 no. car parking spaces along the eastern boundary. The proposed development will facilitate an increase in waste acceptance of 99,000 tonnes per annum, resulting in a total annual w
for: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings
to erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works
to erect a fully serviced part two storey, part single storey dwelling, entrance, boundary walls and piers, waste water treatment facilities, detached domestic garage, and all ancillary works
to construct detached dwelling, detached domestic garage, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works
to demolish existing mushroom houses and erect fully serviced part two storey, part single storey dwelling, upgrade existing entrance, new sewerage treatment facilities & all ancillary works