Pollakeel, Carrickaboy, Co Cavan
Proposed development
To construct (1) construct new storey and half 3 bedroom detached dwelling with a single storey flat roof side projection (2) construct new detached garage (3) waste water treatment plant and percolation area (4) new vehicular entrance off the public road and (5) all necessary ancillary site development works to facilitate this development
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 17 Mar 2021
- Residential units
- 1
- Floor area
- 472 m²
Timeline
Application received
16 Dec 2020
Council asked for further information
2 Feb 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
18 Feb 2021
Decision due
17 Mar 2021
Decision: conditional
24 Feb 2021
Grant issued
13 Apr 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to demolish existing farm buildings and construct in their place a five bay shed consisting of slatted area with slurry holding tank underneath, calf pens and all associated site works
to demolish single storey extension at back of existing dwelling and construct in its place a dormer type extension, sewerage treatment unit, percolation area, erect new entrance walls and piers and all associated site works
is sought for bungalow, detached domestic garage, effluent treatment system, percolation and site development works. Significant further information and revised plans have been submitted.
minor technical amendments to the development permitted under Planning Reg No 16/494 to provide for (i) an increase in the permitted wind turbine rotor diameter from 60 metres to up to 70.5 metres; (ii) re-location of the permitted wind turbine by c. 4 metres to the south together with the re-location of associated ancillary infrastructure; and (iii) all associated site development works. There shall be no increase in the tip height of the permitted wind turbine which shall not exceed 91 metres. Significant further information and revised plans have been submitted.
construct workshop within existing farmyard as part of an existing rural based business, connect to existing services and associated works
to demolish existing lean-to garage & boiler area and replace with new boiler room and level access bathroom facilities, conversion of existing living room to bedroom and all ancillary site works