Cloggagh/Kilquilly, Ballyjamesduff, Co Cavan
Proposed development
The demolition of one loading bay and the construction of new facility containing: tempering room, debox room, retail room, box storage, holding chill, dispatch area, loading bay and 36 car parking (total roofed floor area 5864sqm, maximum height 11.4 metres) and all ancillary works including an attenuation tank
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 27 Feb 2019
Timeline
Application received
29 Nov 2018
Council asked for further information
25 Jan 2019
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
31 Jan 2019
Decision due
27 Feb 2019
Decision: conditional
8 Feb 2019
Grant issued
19 Mar 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for EXTENSION OF DURATION of 18/501: the demolition of one loading bay and the construction of new facility containing: tempering room, debox room, retail room, box storage, holding chill, dispatch area, loading bay and 36 car parking (total roofed floor area 5864sqm, maximum height 11.4 metres) and all ancillary works including an attenuation tank
for the following: 1) Construction of an extension to the existing building containing a retail room, de-boxing area, tempering area, tray storage & store, 2) additional carparking area and 3) all associated site works. The site currently has an EPA IED Licence (Reg. No. P0169-02)
for (1) RETENTION of extensions (creep areas & lean-to structures) to sides of slatted house (exempted development), and (2) PERMISSION to erect additional pitched roof extension & all ancillary works
to retain alteration to site boundaries and all associated works (previous Planning Reg. 20/447 relates to this site)
for construction and operation of an energy storage system comprising (i) 5 no. containerised energy storage modules placed on concrete plinth foundations; (ii) 5 no. electrical transformer and inverter modules; (iii) heating, ventilation and air conditioning units; (iv) 130m of site access tracks; (v) underground electrical and telecommunications cabling; (vi) CCTV security monitoring system; (vii) an up to 2.95m palisade fence around the energy storage system compound; (viii) all ancillary electrical and communications equipment; and (ix) all associated site development, drainage and reinstatement works. This development is for the purposes of an activity requiring an Integrated Pollution Control license.
to 1. RETAIN existing basement & wrap-around balcony, 2. Addition of a two storey and part single storey extension to the side with granny flat on ground floor & master bedroom over, 3. Alterations to front elevation to allow feature window seat and moving of front door, 4. Alterations to glazing & door openings on all elevations to allow new design with a canopy over a section of rear elevation, 5. Alteration of internal layout to allow new design, 6. Use of basement as part of the main house with a new stair connection, 7. Addition of a dormer window to the rear of the house in attic space and 8. Moving of vehicle entrance and re-building of boundary walls, maintaining existing drainage connections and all ancillary site works