Goodly Barrow, Ballyellin, Co. Carlow
Proposed development
The change of use of first floor area from storage area to use as meeting /community function areas, change of use of existing indoor carparking spaces to use as 4 No. new startup business hubs and all associated site works at Goodly Barrow, Ballyellin, Co. Carlow, a Protected Structure CW124A (Mill Building, Goresbridge)
- Applicant
- Not published
- Authority
- Carlow County Council
- Decision due
- 20 Oct 2026
Timeline
Application received
26 Aug 2026
Decision due
20 Oct 2026
Decision: conditional
16 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for a change of use from a two bed dwelling to short term accommodation to the existing approved permission 21619. The property is a protected structure C105, NIAH NO. 12311006
for a change of use from a two bed dwelling to an air b&b to the existing approved permission 21619. This property is a protected structure
for refurbishment of existing dwelling, replacement of rear section of roof and proposed extension to first floor level to rear (the building being a protected structure RPS C106 NIAH 12311014 and all associated works
the change of use of first floor area from storage area to use as meeting /community function areas, change of use of existing indoor carparking spaces to use as 4 No. new startup business hubs and all associated site works at Goodly Barrow, Ballyellin, Co. Carlow
The development will consist of: (a) the demolition of the existing agricultural metal shed; (b) the construction of 13 no. residential units (comprising 4no. three-bedroom semi-detached houses (House Type A), 2no. four-bedroom semi-detached house (House Type B), 4no. two-bedroom Maisonettes (House Type C), 3no. three-bedroom terraced houses (House Type D)); (c) the construction of a bin store, new well and pump house; (d) new vehicular access road and footpath off Chapel Street; (e) reconfiguration of existing public carparking, and new onsite carparking, including bicycle parking; and (f) SuDS drainage, landscaping, boundary treatment, and all associated site works to facilitate the development. Barrack Street: The development will consist of: (a) the demolition of the non-original two-storey extension and metal shed to the rear of the existing property; (b) the subdivision of the existing dwelling at ground and first-floor level, to accommodate 2 no. townhouses including the construction of a new two-storey rear extension, internal alterations, and alterations to all elevations; and (c) SuDS drainage, landscaping, boundary treatment, and all associated works to facilitate the development.
for development of the Goresbridge Motor Home Aire consisting of: two storey amenity building (207.5sqm) [including (Ground Floor) Shop & Reception, Kitchen & Laundry, Male, Female & Accessible W.C.’s, Store, Lift, & Boiler room; and (First Floor) Office & Store, Accessible W.C., Storage Room, Lift & Meeting Room], 20 No. campervan parking spaces, incorporating 4 No. overflow parking spaces, 1 No. dedicated staff and 1 No. accessible parking space, communal waste disposal and bin storage facilities, internal road improvements, landscaping, designated tent camping area; and connection to public water supply and public foul sewer network, together with all associated ancillary works at Cois Bearbha People’s Park, Goresbridge, County Kilkenny. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.