ObjectRight
Back to search
2560213Grantedretention

No. 40 Kernanstown, Bennekerry, Co. Carlow

Not open for objections: The council has already decided this application.

Proposed development

Retention permission is sought for the as-built pitched roof to the rear of dwelling

Applicant
Not published
Authority
Carlow County Council
Decision due
18 Sept 2025
Residential units
1
Floor area
1 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    25 Jul 2025

  2. Decision due

    18 Sept 2025

  3. Decision: conditional

    11 Sept 2025

  4. Grant issued

    14 Oct 2025

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2560273Granted

the construction of a single storey extension to existing clubhouse, the demolition of existing toilets and smoking area, permission for 2no. playing pitches, associated fencing & lighting, a precast concrete ball skills wall, the construction of a machinery shed, a walking track, a proposed new car park and boundary perimeter fence. Retention permission for alterations to existing dressing rooms and all associated site works

Palatine GAA Club, Bennekerry, Carlow Carlow County Council Received 10 Sept 2025
2560263Granted

the construction, of a new two-storey style dwelling house, proprietary sewage treatment system and percolation area, site entrance and connection to services and associated site works

Tullow Road, Bennekerry, Carlow Carlow County Council Received 3 Sept 2025
2460376Granted

construct an extension to dwelling house. Permission to demolish previous built extensions to facilitate same works. Permission for necessary renovations to same house and associated site works.

Tullow Road, Bennekerry, Co. Carlow Carlow County Council Received 26 Nov 2024
2460342Refused

the relocation of 2 number piers and gates from Bennekerry Gate Lodge within the grounds of Bennekerry House, to form part of a new entrance ( for Bennekerry House) constructed under Planning Reference Number 22/311 and all associated site works within the curtilage of Bennekerry Gate Lodge, ( Protected Structure RPS CW174) at Bennekerry House ( Protected Structure RPS NO. CW173, NIAH No10300729)

Bennekerry House, Bennekerry, Co. Carlow. Carlow County Council Received 25 Oct 2024
2460333Awaiting decision

the relocation of 2 number piers and gates from Bennekerry Gate Lodge within the grounds of Bennekerry House, to form part of a new entrance ( for Bennekerry House) constructed under Planning Reference Number 22/311 and all associated site works within the curtilage of Bennekerry Gate Lodge, ( Protected Structure RPS CW174) at Bennekerry House ( Protected Structure RPS NO. CW173, NIAH No10300729)

Bennekerry House, Bennekerry, Co. Carlow Carlow County Council Received 18 Oct 2024
2460302Granted on appeal

development that would extend the existing metal recycling facility (permitted under Reg. Ref. 09/308) at the site of Flynn's Metal Recycling Ltd., Tullow Road, Bennekerry, Co. Carlow. The proposed development consists of: • The retention of an extended concrete yard, and a hardcore surface yard and its proposed upgrade to a concrete surface, to integrate with the use and operation of the existing metal recycling facility. • The retention of boundary treatments including palisade fence on retaining wall. • The retention of a weigh bridge and ancillary cabins. • The demolition of existing storage and ancillary buildings. • The erection of a new single storey pitched roof workshop and materials storage building, that will include a management office and staff welfare facilities, with solar panels at roof level. • The erection of portable block walls to form external bays to store segregated metals. • The creation of a new site access from the R725 and a gated entrance and the closure of the existing site entrance. • Site drainage works, boundary treatments, lighting, landscaping, parking areas for cars and trucks, signage and all other site development works above and below ground. • This will facilitate the increase in intake of waste materials to 17,500 Tonnes per annum

Flynn's Metal Recycling Ltd, Tullow Road, Bennekerry Carlow County Council Received 24 Sept 2024