Milltown, Garyhill, Co. Carlow
Proposed development
To install an underground waste water treatment system together with all other associated site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Carlow County Council
- Decision due
- 10 Nov 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
3 Jul 2025
Council asked for further information
25 Aug 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
14 Oct 2025
Decision due
10 Nov 2025
Decision: conditional
4 Nov 2025
Appeal decided: refused (PL-500382-CW-25)
13 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a part two-storey, part single storey dwelling, single storey domestic garage, appropriate waste water treatment system and associated percolation area, new entrance, bored well and all ancillary site works and landscaping
the demolition of an existing extension and the construction of a 1-storey 3-bedroom extension, hard and soft landscaping, boundary treatments, treatment system and all associated works to facilitate the development
the demolition of an existing extension and the construction of a 1-storey 3-bedroom extension, hard and soft landscaping, boundary treatments, treatment system and all associated works to facilitate the development
installation of an underground waste water treatment system together with all other associated site works at milltown, Garyhill, Co. Carlow
the installation of a new wastewater treatment plant to serve existing dwelling. The installation includes the siting of a proprietary packaged treatment unit below ground level. A suitably sized percolation area will be constructed for the final discharge of treated effluent to ground based on site-specific percolation test results and soil conditions
brick finish to the front, side and rear of existing dwelling house as constructed, to retain ground floor bay window as constructed to the front of same, to retain “Dutch” style gables to the side and front of same, all ancillary site works and services