Ballycurragh Stud, Ballycurragh, Rathoe Tullow
Proposed development
To construct a two-storey dwelling, appropriate waste water treatment system and associated percolation area, new entrance off existing laneway, bored well, 6 no. stables with associated tack and feeding room, hard standing area and all ancillary site works and landscaping
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Carlow County Council
- Decision due
- 21 Jan 2026
- Residential units
- 1
- Floor area
- 252 m²
Timeline
Application received
2 Jul 2025
Council asked for further information
22 Aug 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
16 Dec 2025
Decision due
21 Jan 2026
Decision: conditional
20 Jan 2026
Grant issued
20 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of shed / store used for domestic purposes and storing of vintage vehicles, and all associated site works
PL18-296 for the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment sewage, percolation area and all associated site and landscaping works
Permission for development for a part single storey / part two storey dwelling, waste water treatment system and percolation area, new vehicular entrance and all associated site works
Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999
Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c 540 sqm. c 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c 160 sqm. c 3m high) 6 No. modular containers to house electrical and control equipment (total area of c 195 sq m c 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (SESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999.
the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment system, percolation area and all associated site and landscaping works