Cloghna, Milford, Carlow
Proposed development
To construct a dwelling house, domestic garage, waste water treatment system, percolation area, new bored well, new splayed entrance and associated site work
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Carlow County Council
- Decision due
- 4 Jun 2025
- Residential units
- 2
- Floor area
- 219 m²
Timeline
Application received
5 Feb 2025
Council asked for further information
28 Mar 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
8 May 2025
Decision due
4 Jun 2025
Decision: conditional
29 May 2025
Grant issued
1 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the demolition of a single storey cottage to be replaced with the construction of a two storey dwelling, domestic garage, upgrading of existing entrance, bored well, secondary treatment system & soil polishing filter, and all associated site works
the demolition of a single storey cottage to be replaced with the construction of a two storey dwelling, domestic garage, upgrading of existing entrance, bored well, secondary treatment system & soil polishing filter, and all associated site works
A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
development will consist of a new two storey dwelling extending to c.235msq. The proposal also includes associated site works including a new entrance gateway and lane, a septic tank unit, associated treatment systems, new boundary fencing and hedge and required services connections
the development will consist of a new two storey dwelling extending to c.235msq. The proposal also includes associated site works including a new entrance gateway and lane, a septic tank unit, associated treatment systems, new boundary fencing and hedge and required services connections
To construct a single storey, split level dwelling while demolishing an existing single storey dwelling, upgrading existing entrance, detached garage, new waste water treatment system, percolation area, bored well, and all associated site works