Barrow Canal, adjacent to junction of R705 and L3044, Dunleckny Bagenalstown
Proposed development
For the re-construction of a section of an existing riverside retaining wall to the Barrow Canal adjacent to junction of R705 and L3044, in the townland of Dunleckny, Bagnelstown. The development will consist of the re-construction of a section of an existing riverside retaining wall, approximately 12m long, which has partially collapsed. The new section of retaining wall shall be constructed in reinforced concrete with stone cladding to match the existing stone retaining wall. An Ecological Impact Assessment and a Natura Impact Statement have also been prepared in respect of the proposed works and submitted with the application.
- Applicant
- Not published
- Authority
- Carlow County Council
- Decision due
- 21 Feb 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
19 Dec 2024
Decision due
21 Feb 2025
Decision: conditional
19 Feb 2025
Grant issued
24 Mar 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the as-built 2-storey extension to the rear
the alteration to house design as granted under Pl Ref: 24/ 60312 including the repositioning of same on site, all ancillary site works and services
PL20/404: for demolition of existing beer garden structure and roof to rear of existing public house: change of use from existing public house and ancillary uses, at ground and first floor to 5 no. apartments, consisting of 4 no 1 bed units and 1 no 2 bed unit, along with internal modifications to accommodate new apartments, external modifications to existing north, south and west elevations to accommodate new recessed balconies, new windows and enlargement of existing window opes: all with associated site works
the construction of a 3-storey split-level block of apartments comprising 2no. 1beds & 4no. 2beds, new entrance, onsite parking, connection to mains water, public sewer & stormwater and all associated site development works
a new first floor window to the front elevation of existing dwelling
the construction of a two-storey extension to the rear of existing dwelling and all associated site works