Ballycarney, Co. Carlow
Proposed development
To demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Carlow County Council
- Decision due
- 22 Mar 2021
- Residential units
- 1
- Floor area
- 106.63 m²
Timeline
Application received
14 Apr 2020
Council asked for further information
2 Jul 2020
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
23 Feb 2021
Decision due
22 Mar 2021
Decision: conditional
12 Mar 2021
Grant issued
14 Apr 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
1. The change of use of our existing dwelling to be used to facilitate the expansion of our existing adjoining childcare facility, upgrading of existing septic tank & percolation area to secondary treatment system & soil polishing filter. 2. The construction of a single storey extension to the rear & side elevations of the afore mentioned childcare facility, associated carparking spaces and all associated site works at